Service Center  
 
Technology communication

Protein Skimmer Installation

add Time:2014/12/26 11:18:02


1. It should be installed in a strong ground made of concrete and mesa.

2.Use the plumb to measure the verticality of the column body and make sure the verticality is less than 5mm.

3.Use the clamp to fix this product after leveling up.

4.Make a good connection with every rubes.

首  页 | 关于汇新 | 产品中心 | 联系我们   
版权所有:大连汇新钛设备开发有限公司 服务热线:86-411-62619801 传真:86-411-62619804 备案后:辽ICP备05023974号